Of late we have been trying to get both the loft and the garden in order.
We want to use the loft for storage so we want to keep the temperature more even inside the loft space itself.
So we have been looking at addition insulation to the pitch, as if we were going to use it as a room. This will also help with the house as we were warned by the surveyor that the insulation under the loft boards was not up to current standards.
In addition the loft is only boarded in the centre so we need to finish that.
We chose to use SuperQuilt in the pitch as that seemed to be the best we could afford.
As we have quite a lot of stuff in the loft already and we want to finish the boarding we decided to tackle this project one pitch at a time (there are three pitches, front, side and back as we are have a semi-detached house).
I had already started to board out the back, so once that was complete we ordered 4 rolls of SuperQuilt, some staples and a staple gun.
We cleared the back of the loft, including the old water tank, ready to nail the quilt up and as we had the area clear for the first time since we moved in we thought we would just quickly check that the insulation under the loft boards was okay. Only to find that it was not! Some bits were as we expected, some bits were very poor quality, some had no insulation at all and one section was filled with old expanded polystyrene ceiling tiles:
Fortunately there was an excess of loft insulation placed around the eves, which the surveyor had warned us that we should move, so we were able to use the excess instead.
We also had a hole in the party wall at the top of the pitch that the surveyor had advised us to put a brick in, so Kate had shown off her brick working skills:
The roll of SuperQuilt ready to go up:
We want to use the loft for storage so we want to keep the temperature more even inside the loft space itself.
So we have been looking at addition insulation to the pitch, as if we were going to use it as a room. This will also help with the house as we were warned by the surveyor that the insulation under the loft boards was not up to current standards.
In addition the loft is only boarded in the centre so we need to finish that.
We chose to use SuperQuilt in the pitch as that seemed to be the best we could afford.
As we have quite a lot of stuff in the loft already and we want to finish the boarding we decided to tackle this project one pitch at a time (there are three pitches, front, side and back as we are have a semi-detached house).
I had already started to board out the back, so once that was complete we ordered 4 rolls of SuperQuilt, some staples and a staple gun.
We cleared the back of the loft, including the old water tank, ready to nail the quilt up and as we had the area clear for the first time since we moved in we thought we would just quickly check that the insulation under the loft boards was okay. Only to find that it was not! Some bits were as we expected, some bits were very poor quality, some had no insulation at all and one section was filled with old expanded polystyrene ceiling tiles:
Fortunately there was an excess of loft insulation placed around the eves, which the surveyor had warned us that we should move, so we were able to use the excess instead.
We also had a hole in the party wall at the top of the pitch that the surveyor had advised us to put a brick in, so Kate had shown off her brick working skills:
The roll of SuperQuilt ready to go up:
The first strip, which took about two hours (despite claims on the website about it taking two hours to do the whole loft):
There is a beam running along the pitch about halfway, so we had to split the next strip along its length and sealed the join with aluminium tape:
Then we had to do the same again for the part of the pitch under the beam:
We had to give up before we had fully finished because the supplied staple gun was really crap and finally gave out. We bought a new stapler at Screwfix the next day and were able to finish that pitch.